top of page
FullSizeRender 3.HEIC

Geekdom 

Type of Space

Geeks hub

Traget Users

People with GEEK interest

Location

Lusail Boulevard 

Project Type

Activities and Workshops

Deliverables 

Construction Documents and Physical models

The project began with the 2022 batch and continued with our batch. It was a collaboration with the Doha Film Institute (DFI). Initially, a group of eight students worked on the project, and later five students continued developing it, ultimately delivering construction documents and a physical model, which is now displayed at the DFI reception.

The project's objective was to create a space that serves individuals interested in cosplay, gaming, and workshops providing a dedicated hub for the geek community. The final deliverables, including the construction documents and the physical model, were handed over to DFI, with the model now displayed at the DFI reception.

Site Visit

IMG_1515_edited.jpg
Screenshot 2025-05-02 at 12.06.10 PM.png
Screenshot 2025-05-02 at 12.06.02 PM.png
Screenshot 2025-05-02 at 12.05.48 PM.png

We visited GEEKEND to observe and understand the user experience, with the goal of identifying the necessary design elements and user requirements. This was achieved through informal interviews with visitors, allowing us to gain insights into the space and its overall theme.

Clients Meeting and Revisions

Screenshot 2025-04-27 at 8.33.33 PM.png
Screenshot 2025-04-27 at 8.34.11 PM.png
Screenshot 2025-04-27 at 8.35.08 PM.png
Screenshot 2025-04-27 at 8.34.38 PM.png
Screenshot 2025-04-27 at 8.35.22 PM.png
Screenshot 2025-04-27 at 8.35.01 PM.png

Throughout the project, we held weekly meetings with different departments to review and refine the documents. Revisions were not limited to space planning; they also included reflected ceiling plans (RCP), power and data layouts, safety and fire regulation compliance, finish plans, furniture plans, and detailed specification sheets for each section.

Model Making

Screenshot 2025-05-02 at 12.53.23 PM.png
Screenshot 2025-05-02 at 12.53.37 PM.png
Screenshot 2025-05-02 at 12.53.01 PM.png
Screenshot 2025-05-02 at 12.52.54 PM.png
Screenshot 2025-05-02 at 12.53.15 PM.png

For my part of the project, I was assigned to design the lounge area, which featured a slightly different aesthetic compared to the other spaces. It was envisioned as a mini Geekdom, hosting cosplay shows, a board game room, and a café. The café serves both lounge visitors and external guests through a window counter. Additionally, the lounge includes its own separate entrance, allowing it to operate independently during special events, along with a small ticketing corner for easy access control.

Shelving 

Screenshot 2025-05-02 at 12.41.19 PM.png
Screenshot 2025-05-02 at 12.41.57 PM.png
Screenshot 2025-05-02 at 12.42.17 PM.png

We used heavy machinery such as CNC to build a custom shelving unit designed specifically for the exhibition. Through teamwork, we carried out the entire process, including construction, sanding, gluing, and painting.

Screenshot 2025-05-02 at 1.41.08 PM.png
Screenshot 2025-05-02 at 1.41.22 PM.png
Screenshot 2025-05-02 at 1.41.16 PM.png

The final look of the shelving

Exhibition Invitation Card

3c1839c0-94db-4ab1-a343-8cc9dd49c229.JPG
IMG_0899.JPG

Process Video

Exhibition Day 

Second Phase 

After the exhibition, we reviewed the construction documents and revised all the redlines. The changes were minor and mainly focused on ensuring a proper layout for final submission to the Doha Film Institute (DFI).

DFI Visit

2B139969-61EC-41B5-B364-BE4505E6ABE9.JPG
159efb10-c1c3-4987-ab12-7f56323ba82b.JPG
427b6014-4ae6-4a59-a626-608feff008ad.JPG
35e4fb0d-fcdc-42bb-9784-60e1fa9f6c7b.JPG

We then conducted a site visit to the DFI reception to take measurements of the wall where the shelving unit and models would be placed. Some of the models needed to be redone to better fit the scale of the space, as this setup would form a small exhibition corner representing GEEKDOM in the reception area of the DFI office located in Katara Cultural Village.

66FE41B3-D5F8-4228-AA9A-7B7A8BE26928.JPG
Screenshot 2025-05-02 at 2.31.53 PM.png

Model Making Process

Screenshot 2025-05-02 at 2.32.02 PM.png
Screenshot 2025-05-02 at 2.31.34 PM.png

Final Outcome

Screenshot 2025-05-02 at 2.32.54 PM.png
Screenshot 2025-05-02 at 2.32.43 PM.png
Screenshot 2025-05-02 at 2.32.33 PM.png
Screenshot 2025-05-02 at 2.32_edited.jpg
Untitled design_edited.png

Previous 

Next

bottom of page